Trapo GmbH

Number of employees

100 - 500

Year founded

1957

Headquarter location

48712 Gescher-Hochmoor, Germany

Industry

Intralogistics

More Information
Trapo

Maximum Efficiency in Production and Intralogistics

We think visionary - and present innovative solutions for markets, industries and products long before they become necessary. Environmental protection as well as research and development play a central role: We work closely with universities, such as RWTH Aachen University, to continuously improve our products and services.
Read More
To the Offerings

Product Portfolio of Trapo GmbH

Here you can find an overview of all offerings by the supplier in the platform.

High-Speed Pick & Place System (HPPS Serie)

Kinematics exceeds limits and offers more possibilities for picker application. With enormous stroke and extended radius, the kinematics solution ensures consistently high process quality, machine availability and enormous cycle rates.
High-Speed Pick & Place System (HPPS Serie)

Price from

On request


Robot type

Jointed-arm robot


Gripper

Mechanical, Pneumatic


Picker cell dimensions (LxWxH)

Min. 2 x 2 x 2 m


Product type

Containers, cartons, bags, paperbag, polybag


Action radius

360°

More Information

TRAPO Transport Shuttle (TTS)

The TRAPO Transport Shuttle (TTS) is a driverless transport system, transports up to 2,000 kg and can be equipped with customer-specific superstructures, such as an additional conveyor or integrated lifting function, depending on the company's needs.
TRAPO Transport Shuttle (TTS)

Price from

Project-specific


Primary load carrier

Europallet


Secondary load carrier

Industrial pallets, cartons


Transport weight

300 - 2,000 kg


Mounting and dismounting height flexible

Yes


Max. Lifting height

n/a

More Information

TLS 3600

Autonomous truck loading and unloading: TRAPO closes safety gap between warehouse and loading bay.
TLS 3600

Price from

On request


Primary load carrier

Euro pallet


Secondary load carrier

Industrial pallet


Duration of a full load

25 min


Loading method (how many load carriers at once)

Individual rows of load carriers (3...


Buffer zone necessary

Yes

More Information

Contact the Supplier

Here you can get in touch with the supplier without any obligation. Your message will be forwarded via our contact form.
Continue to interesting solutions.

Here you will find selected solutions that might interest you.

Back to Filter Selection