| Price from | On request |
| Primary load carrier | Euro pallet, Industrial pallet |
| Secondary load carrier | Industrial pallet |
| Duration of a full load | 5.5 min (For a system with a buffer field.) |
| Loading method (how many load carriers at once) | All rows of load carriers |
| Buffer zone necessary | No |
TLS 3600




















