Price from | On request |
Primary load carrier | Euro pallet, Industrial pallet |
Secondary load carrier | Industrial pallet |
Duration of a full load | 5.5 min (For a system with a buffer field.) |
Loading method (how many load carriers at once) | All rows of load carriers |
Buffer zone necessary | No |
TLS 3600
